Posts

Showing posts from September, 2019

process of earth works

Image
Sequence of earth works Materials and Tools Used:   The following are the materials used for the earthwork for foundation. 1. Spade, 2. Kassi, 3. Pick Axe, 4. Crow Bar, 5. Rammer, 6. Wedge, 7. Boning Rod, 8. Sledge Hammer, 9. Basket, 10. Iron Pan, 11. Line and Pins    Drawings Required 1. Centerline Drawing 2. Layout Plan Size of Foundation a. For Main Walls 4’0” Depth b. For Partition Walls 2’0” Depth   Scope of the work:  Setting out of corner benchmarks.  Survey for ground levels.  Survey for top levels  Excavation to approved depth.  Dressing of loose soil.  Making up to cut off level  Constructing dewatering wells and interconnecting trenches.  Marking boundaries of the building.  Constructing protection bunds and drains Working Procedure The extent of soil and rock strata is found by making trial pits in the construction site. The excavation and depth is decided according to the foll...